VITEK
Home/Case Studies
PROVEN OPERATIONAL RESULTS

Measurable results on the factory floor.

Explore how our custom industrial software solutions have solved high-friction bottlenecks in manufacturing, supply chain, and plant operations across Mexico.

Automotive & StampingEl Marqués, Querétaro
View industrial software solution

IATF 16949 Traceability & Digital Poka-Yoke for Tier-1 Automotive Supplier

The Operational Bottleneck:

Manual assembly of wiring harnesses recorded up to 8 monthly defect escapes due to operator fatigue and paper checklists, risking severe customer penalties.

The Implemented Architecture:

Touch-based digital Poka-Yoke station integrated with 2D barcode scanners and smart torque wrenches, enforcing strict sequence locking.

0 Escapes
Defect escapes in 12 months
-85%
Audit genealogy search time
100%
IATF regulatory compliance
Food & Beverage ProcessingEl Salto, Guadalajara (Jalisco)
View ERP integration solution

Automated Batch Weighing & Scale Integration with SAP ERP

The Operational Bottleneck:

Operators manually wrote batch scale weights on paper tickets, later retyped into SAP. This manual gap caused over $35,000 USD quarterly in untracked batch variance.

The Implemented Architecture:

Industrial edge middleware interfacing Toledo scales via Modbus TCP, validating batch codes and committing net weights straight into SAP BAPIs.

-99%
Weighing variance reduction
15 hrs/sem
Manual data entry hours saved
3 meses
Full project payback (ROI)
Metal Stamping & AppliancesApodaca, Monterrey (Nuevo León)
View OEE dashboard solution

Real-Time Shop-Floor OEE Telemetry for Heavy Stamping Presses

The Operational Bottleneck:

Heavy stamping presses suffered unrecorded micro-stoppages. Next-day Excel OEE estimates hid critical bottlenecks, bleeding operational capacity.

The Implemented Architecture:

Non-invasive current sensing clamps and edge IoT gateways streaming machine states via WebSockets to 65-inch shop floor Andon screens.

+14%
OEE machine availability gain
-35%
Unplanned downtime reduction
4.5 meses
Total capital payback
Free Engineering Diagnostic

Facing a similar bottleneck on your production line?

Tell us about your operational challenge. We evaluate your process and deliver a technical and commercial feasibility proposal in under 48 hours.