VITEK
Manufacturing Execution Without Bloat

MES Implementation for Manufacturing Plants

Work order dispatching, serial-level piece genealogy, scrap control, and line balancing tailored for industrial operations without multimillion-dollar licenses.

The Operational Bottleneck

The blind spot between ERP production orders and shop-floor reality

Your ERP dispatches a 10,000-piece work order, but has zero visibility into whether line 3 is choked, how many parts were scrapped, or where WIP inventory is stalled.

01

Paper traveler sheets that get lost or smudged

Physical shop traveler clipboards suffer manual errors and prevent real-time tracking.

02

Unknown work-in-progress (WIP) balances

Material piles up between stations without digital visibility until physical shift-end counts.

03

Heavy enterprise MES with 18-month adoption cycles

Bloated overseas systems with rigid workflows and per-seat license fees that choke plant agility.

Engineered Solution

A lean operator-friendly MES deployed in weeks with full code ownership

We deploy lean MES modules reflecting your plant's exact physical routing: order dispatch, tolerance validation, 1-touch scrap logging, and automated shipping release.

100% sequence compliance

Digital Traveler Routing

Each pallet or serial number advances via barcode scans, preventing out-of-order operations.

-70% logging time

1-Touch Scrap & Rework Logging

Touchscreen operator inputs classifying defects in 2 seconds with automatic real-time Pareto charts.

< 1s sync speed

Bi-Directional ERP Sync

Pulls released orders from SAP / Oracle / Custom ERP and returns accurate material consumption.

Industrial & Tech Stack
Next.jsTypeScriptPostgreSQLDockerNode.jsGraphQL / RESTZebra Link-OS
FAQ

Frequently Asked Technical Questions

How long does a typical MES deployment take with Devitek?

A functional pilot line is typically live in 4 to 6 weeks. Subsequent lines scale in 1 to 2 weeks each.

Do you charge recurring seat licenses per tablet or user?

No. The source code is 100% owned by your company. You can deploy it across 5 or 50 shop-floor screens with zero extra license fees.

Free Engineering Diagnostic

Ready to Digitize Your Shop Floor?

Tell us about your machinery, lines, or ERP integration goals. We respond with a technical scope within 24 hours.